Logistics

Moving, handling and storing semiconductor and electronics equipment with the care it needs.

Equipment moves, planned like engineering work

Fab tools and production equipment are heavy, sensitive and costly to get wrong. We plan each move with you, covering the method, lifting, protection, transport and schedule, so your equipment arrives ready to install.

Planned, safe lifts

Method statements and lifting plans agreed with your facilities and safety teams before work starts.

Equipment protected end to end

Packing, crating and handling matched to the equipment and the journey.

Built around your production

Moves scheduled around your production windows to keep downtime short.

What we handle

Equipment moving & relocation

From a single tool to a full production line, moved between bays, buildings or sites.

  • Tool move-in and move-out
  • Production line and factory relocation
  • Equipment de-installation and re-positioning support
  • Coordination with your facilities team and equipment vendors

Rigging, hoisting & clean-room moves

Lifting and positioning heavy or sensitive equipment, including inside controlled environments.

  • Rigging and hoisting of heavy equipment
  • Positioning and levelling support at the final location
  • Clean-room moves that follow your gowning and contamination rules
  • Method statements and lifting plans before work starts

Packing, crating & pallets

Protection matched to the equipment and the journey, whether across town or overseas.

  • Protective and anti-static packing
  • Custom wooden crates built to size
  • Pallet fabrication
  • Export crating to your destination's requirements

Trucking, MHE rental & warehousing

Transport and handling equipment when you need it, and a place to keep equipment in between.

  • Trucking for equipment and general cargo
  • Forklift and material handling equipment (MHE) rental
  • Short- and long-term warehousing
  • Storage between de-installation and move-in

How a move is planned

  1. Site survey

    We visit both locations to check access, routes, floor loading and clean-room requirements.

  2. Move plan and quotation

    You receive the method, schedule and quotation to review with your team.

  3. Preparation

    Packing, crating, lifting gear, transport and any permits are arranged in advance.

  4. Move and handover

    Equipment is moved, positioned and handed over, ready for your installation team.

Planning an equipment move?

Tell us what's moving, from where to where, and when.